Not-Finals week
Dec. 10th, 2008 11:20 amAs woggy said - this week is WAY worse than "finals" week.
Sunday I spent ALL DAY in the computer lab doing my last Advanced Stats homework, which was like two whole normal homeworks, which are like small projects in and of themselves. But got that done.
Monday:
8-12 worked on MathStats homework (different class than Advanced Stats)
12-1 Attended Mathstats
1-6 Senior project work on paper and meeting with advisor who (predictably) told us we're not doing well at all
6-8 went to Mathstats help session to get help on doing the second half of the mathstats assignment
8-11 did the preliminary analysis on our MASSIVE Advanced Stats final group project (I'm not going to have to do the actual analysis and post-hocs, those are being divided up amongst the rest of the group, I'm just doing the pre-work and the final write up)
Tuesday:
8-12 finished MathStats homework, finished Manufacturing homework
12:30-1:45 attended Manufacturing
1:45-3:30 worked with Manufacturing group on our last lab write-up
3:30-5 worked with Senior Design group on the paper
5-6 worked with Adv. Stats group on our project (made it more complcated by suggesting we run the second half of the analysis as a either a 2 way anova with nested factors or a 1-way with blocked effects loosing the significance of the nested variable but increasing power by not incoprorating the machine effect we aren't supposed to be studying anyways, neither of which is the simple 3-way the rest of the team thought it should be analyzed as)
6-10 went HOME, did more work on the lab-write up for Manufacturing, then went to bed early and snuggled my boy
Wednesday:
6-11 Work
12-1 MathStats
1-4 Tour of the can plant for coors for Manufacturing requirement (WHY did I save my plant tour til this week???)
4-6 Basketball Band rehearsal
6-9:30 Basketball game
9:30-? Probably more homework
(>.< not a happy wednesday)
Things Remaining to Do this semester:
Manufacturing: Finish + turn in the lab write up [Thursday], finish + present the skate we built [Saturday]
MathStats: Jem keeps saying she'll give me make-up problems from when I was sick but it hasn't happened yet, final on Wednesday
Senior Design: Help write the other 2/3 of our semester report [Monday], make a coordinating powerpoint for company presentation [monday]
Adv. Stats: help teamamates with analysis, write up final presenation, preseent it [Tuesday], do individaul final project because I didn't do good on homeworks this semester >.<[Tuesday]
I can do it!
Sunday I spent ALL DAY in the computer lab doing my last Advanced Stats homework, which was like two whole normal homeworks, which are like small projects in and of themselves. But got that done.
Monday:
8-12 worked on MathStats homework (different class than Advanced Stats)
12-1 Attended Mathstats
1-6 Senior project work on paper and meeting with advisor who (predictably) told us we're not doing well at all
6-8 went to Mathstats help session to get help on doing the second half of the mathstats assignment
8-11 did the preliminary analysis on our MASSIVE Advanced Stats final group project (I'm not going to have to do the actual analysis and post-hocs, those are being divided up amongst the rest of the group, I'm just doing the pre-work and the final write up)
Tuesday:
8-12 finished MathStats homework, finished Manufacturing homework
12:30-1:45 attended Manufacturing
1:45-3:30 worked with Manufacturing group on our last lab write-up
3:30-5 worked with Senior Design group on the paper
5-6 worked with Adv. Stats group on our project (made it more complcated by suggesting we run the second half of the analysis as a either a 2 way anova with nested factors or a 1-way with blocked effects loosing the significance of the nested variable but increasing power by not incoprorating the machine effect we aren't supposed to be studying anyways, neither of which is the simple 3-way the rest of the team thought it should be analyzed as)
6-10 went HOME, did more work on the lab-write up for Manufacturing, then went to bed early and snuggled my boy
Wednesday:
6-11 Work
12-1 MathStats
1-4 Tour of the can plant for coors for Manufacturing requirement (WHY did I save my plant tour til this week???)
4-6 Basketball Band rehearsal
6-9:30 Basketball game
9:30-? Probably more homework
(>.< not a happy wednesday)
Things Remaining to Do this semester:
Manufacturing: Finish + turn in the lab write up [Thursday], finish + present the skate we built [Saturday]
MathStats: Jem keeps saying she'll give me make-up problems from when I was sick but it hasn't happened yet, final on Wednesday
Senior Design: Help write the other 2/3 of our semester report [Monday], make a coordinating powerpoint for company presentation [monday]
Adv. Stats: help teamamates with analysis, write up final presenation, preseent it [Tuesday], do individaul final project because I didn't do good on homeworks this semester >.<[Tuesday]
I can do it!